Tasks
Plans Pro
Pins and tasks are two separate things. The pin only watches an item (see Tracked pages and queries). A task is a to-do for your team about it.
Adding a task. Next to every pin there is a task button (a box with a tick): in the Queries and Pages tables, at the top of a query or page detail, on every Opportunities row and in the cannibalization card (page pairs and queries). Select it to Add task (status To do). Adding a task also pins the item, if it was not pinned yet. Once an item has a task, the button is filled; select it to open the Tasks tab. Pinning never creates a task.

Control pages. When the page you pick under Add task for is a control page of a running test, a heads-up names the test: changing it would take it out of that test’s control (see annotations).
What a task remembers. The item’s clicks, impressions, position and CTR when you added it: from the opportunity row on the Opportunities tab, otherwise for the date range you are looking at.
Unpinning only stops watching the item. Its tasks stay as they are.
Statuses. To do, Doing, Done and Not worth it. On the Opportunities lists, pinned rows and rows with a task move to the top, with a chip showing the task’s status.
Not worth it hides the row from that list (the item stays pinned), and it is not suggested again. If its impressions later change by 50% or more compared with when you added the task, it comes back with a Changed badge. Tick Show hidden under a list to see the hidden rows.
The Tasks tab lists the site’s tasks: open ones first (Doing, then To do), then Done, then Not worth it. Filter by status, type or assignee, change the status, assign a teammate and write a note. Click a task’s title to open the query or page.
Done. Marking a task Done adds a note to the chart (“Task done: …”). 28 days later the task shows the result: the clicks in the 28 days after it was done compared with the clicks when you added it, and how the average position moved.
Plans. Pro and Agency. Owners, admins and members can create and edit tasks; client viewers can see them. A site can have up to 500 open tasks.
Log as annotation (2026-11-05). When a task is Done you can choose Log as annotation: a note with the task’s scope (its page, query, or the pages it is about), title and done day, so you can follow its impact and add control pages to make it a test. Tasks can be about any scope (pages by rule, list or content group, queries, topic clusters), not only one page or query. Open tasks per site: Pro 500, Agency 2,000; Free has none.
All sites. Tasks in the account menu (top right) opens one list of every task across your sites, grouped by site (sites A to Z, newest task first). Choose Open, Done or All. Select a site name or a task to open that site’s Tasks tab, where you change status and notes. The account button shows a small badge with the number of open tasks.
Low CTR “Now” (2026-11-17). A low CTR task’s “Now” uses the same expected CTR as the Opportunities tab (your site’s own curve, or the industry average where your data is thin; see Opportunities “How to read the expected CTR”). For builders: GET /entities/:id/tasks/now loads the workspace’s brand rules and passes them to EntityDO.taskNow(items, brandRules), which loads the cached curve (loadCtrCurve) and passes it to taskNowBatch(..., curve); the cache key carries brandRulesKey. Pages are judged at their average position here (the list sums per query).
Cards, categories and “Now” (2026-11-05). Tasks show as cards like annotations: a header row with the status, the opportunity type and the categories, the title (pages show their path; point at it for the full URL), and Open, Edit category and Log as annotation in the ⋯ menu. A task made from an opportunity starts with a category you can change: decaying page → Content refresh; striking distance → Title tag; low CTR → Title tag + Meta description; cannibalization → Merge. The toolbar has the same Category filter as Annotations. Each opportunity task also says what it was created as and what the page or query is now, for example “Created as: Decaying page · Now Recovered since Oct 12” or “No longer striking distance (now position 7)”; Refresh checks again. The task’s original reason never changes.
Reopening and logging (2026-11-10). Reopening a Done task removes its “Task done” note from the chart; marking it Done again adds the note on the new day (a note you deleted stays deleted). Log as annotation keeps every category of the task and never adds the same note twice: a second click shows the note already logged. The Tasks tab and the all-sites list show every task, however many there are.